Work : Drilling, Blasting, Breaking,transporting and Crushing
Quality : 20,00,000 ton supply GSB,WMM, DUST,10MM, 20MM, aggregate
Our client: KALUWALA CONSTRUCTION PRIVATE LIMITED (KCPL)
Project :Construction of 4 lane divided
carriageway with paved shoulder from km 0+000 to 41+210 (Balaghat-Gondia section) of NH-543 (design length 41.210 km)