Crusher plants and aggregate supply for highway projects
- Crushers owned
- 6plants
- Output
- 120,000MT / month
- Fleet
- 160+ machines
- Worked in
- 10states
250 to 350 TPH
across six plants
nothing on hire
Manipur to Karnataka
20 excavators 55 tippers 10 drilling machines
Full inventoryProducing for
PNC Infratech
Six projects since 2016
L&T
Infrastructure works
MKC Infrastructure
Ujjain–Jaora HAM
NCC Limited
Civil infrastructure
Kaluwala Construction
Three live sites
GHV Infra
Bharuch–Dahej, Gujarat
What we actually sell
Contractors don't want a crusher. They want stone.
Owning a plant means capital, a lease, statutory clearances and an operator you have to keep on the books between projects. We already have all four, six times over.
So we move a plant onto your site, erect it, staff it and maintain it. You get material at the road head and a weighbridge slip against every load. When the road is finished, we take the plant away again.
- Nothing on hire, all owned
- Operators are ours, not agency
- Wear parts are our cost
- Weighbridge slip per load

Own plant, own lease
Taranagar, Rajasthan
250TPH
Services
Eight things we do. One of them is the point.
What comes off the plants
Specs and uses- GSB
- WMM
- 40mm
- 20mm
- 10mm
- Dust
- Boulder
Running right now
Eight sites, four states
- Uttar Pradesh
Prayagraj Ring Road
- Maharashtra
Nanded to Jalna Expressway
- Gujarat
Bharuch to Dahej Road
- Madhya Pradesh
Ujjain to Jaora Greenfield Highway
- Uttar Pradesh
Bajarang Stone Crusher Plant
- Maharashtra
Phaltan to Dahiwadi Road, NH-160
- Maharashtra
Beed Regional Connectivity, NH-52 and NH-561A
- Madhya Pradesh
Western Bhopal Bypass, NH-46
Before you call
What people ask us first
01How long does it take you to mobilise?
About a month from order to steady production on a site with reasonable access: two weeks to move plant and machines, two weeks to erect and commission. Difficult access, a monsoon start, or a lease that has not cleared its permissions will extend it, and we would rather say so before the contract than after.
02Do we need to hold the mine lease, or do you?
Either works. Most of our projects run on client-held leases: you hold the mineral, we bring the plant, the machines and the crew. Where a client would rather buy material than run a quarry, we produce from our own leases and supply you finished material instead.
03How is material measured and billed?
By weight, on a calibrated weighbridge, with a slip against every dispatch. We keep ten weighbridges across our operations for exactly this reason. Month-end reconciliation should take minutes.
04Can you meet our vendor registration requirements?
Yes. Sansar Infra LLP is registered under the LLP Act 2008, and GST, PAN, LLPIN, bank details, work orders and completion certificates go across on request. We have been through the vendor process at PNC Infratech, MKC and others, so the format is familiar.
Get a rate
Tell us what your site needs
Four things and we can quote it. Send it before 6pm on a working day and you will hear back the same day.
Where · What · How much a month · When

