Crusher plants and aggregate supply for highway projects

Crushers owned
6plants

250 to 350 TPH

Output
120,000MT / month

across six plants

Fleet
160+ machines

nothing on hire

Worked in
10states

Manipur to Karnataka

20 excavators 55 tippers 10 drilling machines

Full inventory

Producing for

  • PNC Infratech

    Six projects since 2016

  • L&T

    Infrastructure works

  • MKC Infrastructure

    Ujjain–Jaora HAM

  • NCC Limited

    Civil infrastructure

  • Kaluwala Construction

    Three live sites

  • GHV Infra

    Bharuch–Dahej, Gujarat

What we actually sell

Contractors don't want a crusher. They want stone.

Owning a plant means capital, a lease, statutory clearances and an operator you have to keep on the books between projects. We already have all four, six times over.

So we move a plant onto your site, erect it, staff it and maintain it. You get material at the road head and a weighbridge slip against every load. When the road is finished, we take the plant away again.

  • Nothing on hire, all owned
  • Operators are ours, not agency
  • Wear parts are our cost
  • Weighbridge slip per load
How the firm got here
A Sansar Infra crusher plant and the tipper fleet in a working quarry at sunset, site offices alongside and wind turbines on the ridge behind

Own plant, own lease
Taranagar, Rajasthan

250TPH

Services

Eight things we do. One of them is the point.

What comes off the plants

Specs and uses
  • GSB
  • WMM
  • 40mm
  • 20mm
  • 10mm
  • Dust
  • Boulder

Before you call

What people ask us first

01How long does it take you to mobilise?

About a month from order to steady production on a site with reasonable access: two weeks to move plant and machines, two weeks to erect and commission. Difficult access, a monsoon start, or a lease that has not cleared its permissions will extend it, and we would rather say so before the contract than after.

02Do we need to hold the mine lease, or do you?

Either works. Most of our projects run on client-held leases: you hold the mineral, we bring the plant, the machines and the crew. Where a client would rather buy material than run a quarry, we produce from our own leases and supply you finished material instead.

03How is material measured and billed?

By weight, on a calibrated weighbridge, with a slip against every dispatch. We keep ten weighbridges across our operations for exactly this reason. Month-end reconciliation should take minutes.

04Can you meet our vendor registration requirements?

Yes. Sansar Infra LLP is registered under the LLP Act 2008, and GST, PAN, LLPIN, bank details, work orders and completion certificates go across on request. We have been through the vendor process at PNC Infratech, MKC and others, so the format is familiar.

Another six answers

Get a rate

Tell us what your site needs

Four things and we can quote it. Send it before 6pm on a working day and you will hear back the same day.

Where · What · How much a month · When