01
250 to 350 TPH, three-stage
Primary jaw, secondary cone, tertiary stage and screening. Enough reduction ratio to take a 700mm boulder down to 10mm chips without pushing everything to dust.
Three-stage plants at 250 to 350 TPH, turning shot rock into GSB, WMM and clean 40, 20 and 10mm chips that pass the grading in the site engineer's file.
A crusher is only as good as what comes off the last screen deck.
Nobody buys tonnes per hour. They buy material that passes the grading the site engineer has in his file, load after load, for eighteen months. A plant that runs at 350 TPH and produces stone that fails a sieve analysis is worth nothing to a road contractor.
Our plants run three stages: a primary jaw, a secondary cone, and a tertiary stage feeding screen decks set to whatever the contract calls for. Change the specified grading mid-project and we change the decks. That is a shift of work, not a renegotiation.
What you get
01
Primary jaw, secondary cone, tertiary stage and screening. Enough reduction ratio to take a 700mm boulder down to 10mm chips without pushing everything to dust.
02
GSB and WMM for the sub-base and base layers, 40mm, 20mm and 10mm for bituminous and concrete work, and crusher dust and fines. Same plant, different decks.
03
Decks set to the MoRTH grading in your contract, samples pulled at commissioning and through the run. If a screen is blinding and the grading drifts, we find it, not your quality engineer.
04
Crusher dust is a product, not a waste heap. Sold as fine aggregate and manufactured sand where the specification allows it, which keeps the yard clear and the rate down.
05
Six plants running. A single 250 TPH plant will hold 25,000 to 30,000 MT a month on two shifts, so the fleet total is a real number rather than a nameplate one.
06
Calibrated weighbridges at the plants. Dispatch weight is the billed weight, and the slip goes with the load.
Straight answers
GSB to MoRTH Clause 401 grading, WMM to Clause 406, and single-size 40mm, 20mm and 10mm chips plus crusher dust. Tell us the grading table and the layer it is going into and we will set the decks to it.
Samples are pulled at commissioning and at intervals through the run, and go to whichever lab your contract nominates. We would rather find a drifting grading ourselves than have your quality engineer find it in a stack that has already been laid.
Yes. Most of our crushing is done on client leases, with the client holding the mineral and us holding the plant, the crew and the output number.
Usually goes with
You need crushed stone at the road head. Not a crusher, not a plant manager, not a spares inventory. We bring all three and hand you material.
Material off our plants, on our tippers, to your road head. Priced per tonne delivered, with a weighbridge slip against every load.
Get a rate
Four things and we can quote it. Send it before 6pm on a working day and you will hear back the same day.
Where · What · How much a month · When