01
Licensed and documented
Licensed shotfirers, magazine licensing, explosive handling and the movement records that go with it. The paperwork exists before the explosive arrives on site.
Licensed shotfirers, a design for the rock in front of them, and vibration monitored on every shot. Breaking overburden and rock without breaking anything else.
Blasting is the one operation on a quarry where being roughly right is not a category that exists.
A shot that is over-charged throws rock at things that are not rock. Under-charged, it leaves a toe and oversize that costs more to deal with at the hopper than the explosive saved. Placed without regard to what is standing nearby, it produces a complaint, a stop-work notice, and a district officer on site.
Our crews are licensed shotfirers working under DGMS rules, and every shot is designed for the bench in front of them rather than repeated from the last one.
What you get
01
Licensed shotfirers, magazine licensing, explosive handling and the movement records that go with it. The paperwork exists before the explosive arrives on site.
02
Burden, spacing, stemming and delay sequence worked out for the rock, the face height and the fragmentation the crusher wants. Delays are where fragmentation and vibration are actually won.
03
Fracturing rocky overburden to expose the seam beneath, and breaking rock that a hydraulic breaker would take a month to do at ten times the cost.
04
Ground vibration monitored, exclusion zones enforced, and structures nearby assessed before the first shot rather than after somebody complains about a crack.
Straight answers
Yes. Shots are fired by licensed shotfirers under DGMS rules, with magazine licensing and explosive movement records maintained on site. Your safety officer is welcome to audit any of it.
Usually, with a design built around the constraint: smaller charge per delay, tighter sequencing, more shots of less size. It costs more per cubic metre than an open bench with nothing nearby, and it is a great deal cheaper than a stop-work order.
That depends on what your licence covers and who is named on it. Send us the licence and we will tell you straight whether it works, rather than finding out at the magazine.
Usually goes with
Ten drilling machines with compressor support, putting holes where the blast design says they go, to the depth and angle it says.
Taking a lease from bare ground to a working face: overburden off, rock down, material moving. Twenty excavators and the crews who run them.
Get a rate
Four things and we can quote it. Send it before 6pm on a working day and you will hear back the same day.
Where · What · How much a month · When