Fragmentation: Why Crusher Output Is Decided at the Face

A crusher plant's hourly output is usually blamed on the plant. More often it was fixed a day earlier, by a drilling pattern and a delay sequence at the far end of the haul road.

Blasting10 min read

In short

  • Blast fragmentation is the size distribution of the rock a shot produces. It decides how fast the excavator digs, whether the jaw bridges, and how the plant's product splits between sizes.
  • A jaw crusher takes rock up to about 80 per cent of its feed opening. Anything bigger has to be broken at the face or at the hopper before it can be crushed.
  • Oversize costs breaker hours, stoppages and a starved secondary. Excess fines cost too, because dust is the lowest-value product on a road-aggregate plant.
  • Burden, spacing, powder factor, stemming and delay timing each move the distribution, and the rock's own joints set the limits they work within.
  • Models such as Kuz-Ram predict the distribution and image analysis measures it. The practical measure is at the plant: breaker hours, bridging stops and tonnes per hour through the jaw.
On this page7 SECTIONS

The mining page on this site carries a line most plant managers learn the expensive way: oversize costs more at the hopper than it saves at the face. Widen the pattern and the month's drilling and explosive bill falls. Then the breaker at the hopper works every shift, the jaw waits on it, and a plant rated for 250 TPH delivers well short of that. Nobody books the lost tonnes against the blast.

Blast fragmentation and crusher productivity are one system. What the mining industry calls mine to mill is the practice of running them as one. This article is about the half of it that happens at the face.

What blast fragmentation means

Blast fragmentation is the range of rock sizes a shot produces, from dust to the largest boulder, described as a size distribution: what percentage of the muckpile passes each size. Two parts of that curve matter most to a plant. The top size decides whether the rock will go into the primary crusher at all. The proportion of fines decides how much of the shot passes straight through the plant and comes out as the product nobody is short of.

Good fragmentation is not the finest possible. It is the distribution that costs least across drilling, blasting, loading, crushing and what the product sells as, all taken together.

What size a jaw crusher can take

A jaw crusher is sized by its feed opening: the gape, between the jaw plates at the top, and the width, between the side plates. The usual rule, given by crusher makers and mineral-processing texts alike, is that the largest lump fed should be about 80 per cent of the gape. Some older references allow 85. A rock larger than that, or a slab of the wrong shape, sits across the opening where the jaws cannot grip it.

Top size against jaw opening

Top size = 0.8 × gape

750 mm gape = 0.8 × 750 mm = 600 mm

900 mm gape = 0.8 × 900 mm = 720 mm

1,000 mm gape = 0.8 × 1,000 mm = 800 mm

A 700 mm boulder needs a gape of about 875 mm or more

Length matters as well as thickness. A slab 500 mm thick and 1.5 m long passes the test on one dimension and still bridges the hopper. Blocky rock from widely jointed granite and slabby rock from bedded sandstone fail in different ways, and the blast design has to know which it is dealing with. How the stages after the jaw share the reduction is in jaw, cone and VSI crusher stages.

What oversize boulders in blasting cost

  • The breaker at the hopper. Every boulder that reaches the plant has to be broken by a hydraulic breaker at the feeder while the jaw waits. Metso's estimate is that clearing a bridged jaw takes several minutes, and that ten such stops in a day add up to an hour of lost production.
  • Secondary breaking at the face. Boulders set aside by the excavator are broken on the pit floor or drilled and popped. Either way it is a second handling of rock that has already been paid for once.
  • Slow digging. A coarse, tight muckpile loads slowly. Bucket fill drops, cycles stretch and the tippers queue, so the same fleet delivers less to the hopper.
  • A starved plant. A jaw fed in bursts between blockages sends an uneven stream to the cone. A cone that is not kept full makes a flakier product and wears its liners unevenly.
  • Shock. Large, hard lumps load the jaw plates, the toggle and the bearings hardest.

What excess fines cost

The opposite error is quieter. A shot that is over-charged or badly timed turns part of the bench to dust. In a metal mine that is welcome, because the ore is going to be ground anyway, which is why mine-to-mill programmes there push explosive energy up. A road-aggregate quarry is different. The plant is paid for GSB, WMM and clean 40, 20 and 10mm chips, and fines made in the blast pass the jaw untouched and add to the crusher dust.

Dust has its uses. On our plants it is sold as a product and not left in a heap. But it earns less than chips, and a GSB or WMM blend can only absorb so much of it before it fails the fines limit in its grading. Over-charging also costs explosive, throws rock and raises vibration. The cheapest tonne is the one broken just small enough.

How the blast design moves the size distribution

Blast design and fragmentation · what each variable does
VariableWhat it does to the size distributionWhat it trades against
BurdenToo large and the charge is over-confined: coarse rock, a toe and back-break. Too small and the front blows out and scatters.Drilling cost falls as burden grows; vibration and flyrock risk move with it
SpacingStretch it and boulders appear from midway between holes, soonest on a low bench.The cheapest metre to save and the easiest to overdo
Powder factorMore explosive per cubic metre gives finer rock throughout, and more fines around each hole.Explosive cost, throw, and dust the plant cannot sell as chips
StemmingThe collar zone holds no explosive and breaks only by what the charge below does to it. Long stemming means cap-rock boulders; stemming that blows out wastes the hole.Shorter stemming is traded directly against flyrock
Delay timingEnough time between holes and rows for the rock ahead to move gives each hole a free face and a looser pile. Too little and the shot chokes; scatter in the timing makes the result uneven.Timing is also the main control on vibration

Directions as given in standard blasting references. How far each one moves the result depends on the rock's jointing more than on anything in the design.

The geometry is set out in burden, spacing and sub-drilling and the charge in powder factor. Our blasting page makes the point about the last row of the table: delays are where fragmentation and vibration are actually won.

Two things sit above all five. The rock's own joints decide the largest block that can exist before a hole is drilled, and no design breaks a block that no hole passes through. And the design only works if the holes are where it put them, which is the point of blast hole deviation.

Predicting and measuring fragmentation

Prediction models exist. The best known is Kuz-Ram, developed by Cunningham in the 1980s, which combines an empirical equation for the average fragment size with a standard size-distribution curve. It takes a rock factor, the powder factor, the charge per hole and the pattern geometry, and returns a predicted distribution. Later work has refined it, notably with the Swebrec function, which copes better with a maximum block size. All of them need calibrating to the site, and they are best used to compare one design with another, not to promise a top size.

Measurement is harder than it sounds, because nobody can sieve a muckpile. The methods in use:

  • Image analysis. Photographs of the muckpile, of tipper loads or of the belt after the primary, with a scale object in frame, processed by software such as WipFrag or Split-Desktop into a size distribution. It sees only the surface and under-counts fines, and published comparisons put its error anywhere between 2 and 20 per cent.
  • Boulder count. The number and rough size of boulders set aside from each shot. Crude, and very useful.
  • Breaker hours. Hours run by the breaker at the face and the one at the hopper, set against tonnes crushed.
  • Plant data. Tonnes per hour through the jaw, stoppages for bridging, and the share of crusher dust in the product. The plant measures every shot, whether anyone reads the result or not.

The discipline is to record the pattern, charge and timing of every shot against what the plant then did with it. After a dozen shots the bench has said more than any model will.

Running the face for the plant

This is easiest where one contractor holds the drill, the charge and the crusher, because the cost and the saving land in the same account. Our shots are designed for the bench in front of the crew and for the fragmentation the crusher wants, by licensed shotfirers, and the same firm runs the three-stage plant the rock goes into. If your plant is short of its rated output, send the jaw's feed opening, the present pattern and powder factor, and a few photographs of the muckpile with something in frame for scale. Controlled blasting covers the design side, and crusher plant operations the plant.

Standards and references

  • C. V. B. Cunningham, The Kuz-Ram Fragmentation Model: 20 Years On (2005)
  • F. Ouchterlony, The Median versus the Mean Fragment Size and Other Issues with the Kuz-Ram Model
  • McLanahan Corporation, How to Size a Jaw Crusher
  • Metso, guidance on jaw crusher feed arrangement and bridging
  • Dyno Nobel, Blasting and Explosives Quick Reference Guide (2010)

Published 10 October 2026 by Sansar Infra LLP. Specifications and rules are revised; the edition your contract cites, and the current notification, govern over anything written here.

Asked often

Short answers

01What is fragmentation in blasting?

Fragmentation is the size distribution of the broken rock a blast produces, from fines to the largest boulder. It is described by what percentage of the muckpile passes each size. It controls how easily the rock is dug, whether it fits the primary crusher and how much of it ends up as dust.

02What is the maximum feed size for a jaw crusher?

About 80 per cent of the gape, which is the opening between the jaw plates at the top of the crushing chamber. A jaw with a 900 mm gape takes rock up to roughly 720 mm. Larger or slabby pieces bridge the opening and have to be broken first.

03What causes oversize boulders in blasting?

The common causes are a burden or spacing too large for the hole diameter, too low a powder factor, long stemming that leaves the top of the bench unbroken, poor delay timing, and holes that have deviated from the pattern. Widely spaced natural joints also produce blocks that no hole passes through. Boulders tend to come from the collar zone, the front row and midway between holes.

04What is the Kuz-Ram model?

Kuz-Ram is an empirical model for predicting blast fragmentation, developed by Cunningham in the 1980s. It combines an equation for average fragment size with a size-distribution curve, using a rock factor, the powder factor, the charge per hole and the drilling pattern. It needs calibrating to the site and is most reliable for comparing one design with another.

05How is blast fragmentation measured?

Most often by image analysis: photographs of the muckpile or of loaded tippers are processed by software such as WipFrag or Split-Desktop to estimate the size distribution. Simpler measures are boulder counts per shot, secondary breaker hours, and crusher data such as tonnes per hour and bridging stoppages.

06What does mine to mill mean?

Mine to mill is the practice of designing the blast for the lowest total cost of mining and processing together, not the lowest drilling and blasting cost alone. In metal mines it usually means more explosive energy to raise mill throughput. In an aggregate quarry the aim is a top size the jaw accepts, with as little fines as possible.